Our Experience

Partial Performance List

motor

Electromotor / Generator

  • PT. Freeport Indonesia “Overhaul 4400kW”
  • Palyja “Rewinding Motor 200kW”
  • PLTU Labuan Angin “Repair Generator 800kW”
  • Etc.
TRAFO

Transformer

  • PLTU Tarahan Lampung “Overhaul Trafo 125MVA”
  • Semen Tonasa “Rekondisi Power Trafo 70kV”
  • PLN UPT Bogor “Reklamasi Trafo”
  • Etc.
ASSESSMENT2

Assessment

  • PLN Disjabar “Assessment Kabel 20kV”
  • LN Disjaya “Assessment Kabel 20kV”
  • Donggi Senoro LNG “Oil Analysis & DGA Tes Transformator”
  • PLTU Sekayan ”Electrical Test Generator”
  • Etc.

Clean & Renewable Energy Market Development

OTHERS

Battery Charger Panel

Krakatau Daya Listrik at Cilegon , Krakatau Steel

OTHERS

Load Bank

Djarum – Hartono Plantation at Sumba, “EPCC Load Bank 3 x 1MW”

OTHERS

Solar System

Photo Voltaic with Balance Manual Adjustable Tracker and Transmission