Our Experience
Partial Performance List
Electromotor / Generator
- PT. Freeport Indonesia “Overhaul 4400kW”
- Palyja “Rewinding Motor 200kW”
- PLTU Labuan Angin “Repair Generator 800kW”
- Etc.
Transformer
- PLTU Tarahan Lampung “Overhaul Trafo 125MVA”
- Semen Tonasa “Rekondisi Power Trafo 70kV”
- PLN UPT Bogor “Reklamasi Trafo”
- Etc.
Assessment
- PLN Disjabar “Assessment Kabel 20kV”
- LN Disjaya “Assessment Kabel 20kV”
- Donggi Senoro LNG “Oil Analysis & DGA Tes Transformator”
- PLTU Sekayan ”Electrical Test Generator”
- Etc.
Clean & Renewable Energy Market Development
Battery Charger Panel
Krakatau Daya Listrik at Cilegon , Krakatau Steel
Load Bank
Djarum – Hartono Plantation at Sumba, “EPCC Load Bank 3 x 1MW”
Solar System
Photo Voltaic with Balance Manual Adjustable Tracker and Transmission